Coating / Waterproofing Civic Hall (During)
Waterproofing / Coating Case Study: Civic Hall Painting & Waterproofing
Face lift to Nantwich Civic Hall front elevation. All electrics and fittings were removed by Concrete Solutions and two coats of a high spec Weatherproof coating were applied, with a minimum 15 year life before requiring further maintenance.
Concrete Solutions were contracted to install a suitable waterproof coating to the leaking Canopy over the entrance to Nantwich Civic Hall. After initial preparation a primer coat was applied. This was followed by impregnating fibre glass matting in to two coats of high spec waterproof coating giving a first class finish with a manufacturers 30 year warranty.